OEM / ODM
Your brand on a factory-built PDU
AmpRack builds private-label and fully customized rack PDUs on the same lines as its own units — identical ±1% calibration, identical 100% outgoing test — with your identity on the housing, the web UI and the carton. Configured samples in 3-7 days.
Customization surfaces
Six ways to make it yours
Electrical customization
Input cords in IEC 60309 16/32/63A, NEMA L5/L6/L21 or regional plugs; outlet mixes of C13, C19 and locking variants; cord lengths from 1.5-3m in 1.5-6mm² gauges.
IEC 60309 · NEMA · Schuko · BS
Mechanical & form
1U horizontal or 0U vertical extrusions, housing lengths cut to the outlet count from 8 to 48 positions, silk-screen text and housing color matched to your brand guide.
0U · 1U · 8-48 positions
Firmware & branding
Branded web UI, your company name in the SNMP sysDescr field, an assigned MAC OUI block, custom alarm thresholds and MIB labels organized under your part numbers.
SNMP v3 · Web UI · MAC OUI
Compliance & docs
CE (LVD + EMC), UKCA, RoHS and UL 62368-1 scope documentation issued under your label; certificate copies travel with the order file, shared on request as scans.
CE · UKCA · RoHS · UL 62368-1
Sampling & pilot runs
Configured prototypes from the pilot line in 3-7 days, pilot batches before mass production, and a drawing walkthrough with the engineer who owns the platform.
3-7 day samples · pilot lots
Packaging & logistics
Retail boxes and cartons printed to your artwork in counts of 4-8 units, FOB / CIF / DDP terms as agreed, and packing lists that carry the batch serial range.
FOB · CIF · DDP
Scope & terms
Customization scope, MOQ and lead times
| Custom item | Available options | MOQ | Lead time |
|---|---|---|---|
| Input plug / cord | IEC 60309 16/32/63A, NEMA L5-30 / L6-30 / L21-30, Schuko, BS | 10 pcs | 14-30 days |
| Outlet mix | C13 / C19 / locking C13+C19 / regional sockets, 8-48 positions | 10 pcs | 14-30 days |
| Cord length & gauge | 1.5-3 m; 1.5 / 2.5 / 4 / 6 mm² | 10 pcs | 14-30 days |
| Protocol set | SNMP v1/v2c/v3, REST API, MQTT, Modbus TCP enablement | 10 pcs | 14-30 days |
| Sensor options | RJ12 temperature/humidity, door-contact and leak-sensing bundles | 10 pcs | 14-30 days |
| Housing form factor | 1U horizontal or 0U vertical, length matched to outlet count | 50 pcs | 14-30 days |
| Silk-screen & color | Logo and ratings print, custom extrusion color | 50 pcs | 14-30 days |
| Retail box & carton art | Your artwork, cartons of 4-8 units | 100 pcs | 14-30 days |
| Firmware branding | Web UI brand kit, SNMP sysDescr, custom MIB labels | 100 pcs | 30-45 days |
| MAC address block | Assigned OUI range, provisioned and printed per unit | 100 pcs | 30-45 days |
| Metering profile | Calibration profile to your billing spec, ±1% class basis | 100 pcs | 30-45 days |
| Full ODM (new BOM) | New board layout plus a certification path for your markets | 500 pcs | 45-90 days |
Stock platforms ship from inventory in 7-14 days and most sample requests are built in 3-7 days; the lead times above cover configured production runs after deposit.
Engagement models
Three ways to start
Private label
Choose a platform unit from the four product lines and apply your identity — housing print, web UI, packaging. The fastest route: a stock platform carrying your brand from 10 pcs.
Configured OEM
Your outlet mix, cords, lengths, metering profile and firmware branding on a proven electrical platform. Engineering reviews every drawing with you before the pilot line runs.
Full ODM
A new BOM and board layout with a certification path for your target markets. 45-90 days of runway buys a product competitors cannot quote off the shelf.
A recent configured-OEM run shows the rhythm: 24× C19 three-phase 32A vertical units with a branded web UI and SNMP sysDescr, 200 pcs — pilot built in 5 days, mass production with per-unit calibration records inside four weeks.
The process
From brief to loading bay
Requirements brief
You send the six-point brief: mounting form, input feed, rating, outlet count, plug type, function set. Deliverable: a written spec sheet both sides sign off.
Engineering review & quote
We map the brief to a platform or a custom BOM and flag certification needs. Deliverable: drawings plus a line-item FOB quotation.
Pilot sample
The pilot line builds your configuration, typically in 3-7 days. Deliverable: a sample kit carrying the same test records mass production will.
Sample sign-off
You bench-test and confirm, or request drawing changes; firmware branding is reviewed on a live unit. Deliverable: a frozen revision and a batch schedule.
Mass production & test
The full run passes 100% calibration, function, hipot and burn-in on the main lines. Deliverable: serial-traced test records for the whole batch.
Shipment & aftercare
Cartons per your artwork, handed off FOB, CIF or DDP as agreed. Deliverable: packing list, certificate copies on request and firmware update support.
Put your name on factory-grade power
Send the six-point brief — mounting, input, rating, outlets, plug, functions — and engineering replies within 48 hours with drawings and an FOB quote. Trade terms and sample policy are detailed in the FAQ.