Every unit is powered before it is packed
100% electrical testing is the floor, not the option: continuity, polarity, earth bond, insulation, breaker function and a metering reading compared against a reference meter.
- Testing
- 100% of units
- Metering check
- ±1%
- UL basis
- UL 62368-1 component
- Energy grade
- 1 grade
- Record
- per reporting line
What each unit is checked against
A unit is not signed off on the strength of one reading. The list below runs in order on every build, and the metering lines are compared against a reference instrument.
Coverage: 100% electrical testing · metering class ±1%- Visual and build
- outlet order against drawing
- Continuity
- every line, every outlet
- Polarity
- line, neutral, earth
- Earth bond
- chassis to earth path
- Insulation
- before power-up
- Breaker operation
- trip and reset
- Powered function
- outlet by outlet
- Metering, current
- ±1% + 1 digit vs reference
- Metering, voltage
- ±1% + 1 digit, 1V scale
- Energy register
- 1 grade, 0.1 kWh scale
- Communications
- Ethernet, RS485, SNMP, Modbus
- Alarm path
- SMTP on threshold
Compared, then recorded
The unit reads current, voltage and power on each reporting line. Those readings are set against a reference instrument, and the result is written into the test record for that line.
Environmental input also checked: -30°C to 100°C at 1°C resolution
A powered test, not a visual check
The unit is energised at the bench and each outlet is loaded. Readings appear on the OLED, in the web server and on the SNMP or Modbus registers, so the same figure can be checked in three places.
- Supply
- 110V to 250V AC
- Frequency
- 50Hz to 60Hz
- Load per feed
- 10A to 32A
- Readouts
- current, voltage, power, energy
Six steps, in this order
Order matters: the insulation check happens before power-up, and the metering comparison happens after the unit has run long enough to settle.
Build against the drawing
Outlet type, outlet count and row order are compared with the confirmed drawing revision. A mismatch stops the unit here.
Reference: drawing revisionContinuity and polarity
Every line and every outlet is buzzed through, and line, neutral and earth are checked for the right order. This catches a swapped tail before power.
Coverage: every outletEarth bond and insulation
Chassis to earth path is measured, then insulation is tested with the unit still unpowered. Both results must pass before the breaker is closed.
Sequence: before power-upPower-up and function
The unit runs at its rated window, 110V to 250V AC at 50Hz to 60Hz. Breakers are tripped and reset, and each outlet is loaded in turn.
Rated window: 110V to 250V ACMetering comparison
Current, voltage and power readings are set against a reference instrument on each reporting line. Energy is checked on the 0.1 kWh scale.
Tolerance: ±1% + 1 digitRecord and release
The test record is written per line and filed with the unit. Communications, alarm path and the document set are confirmed before packing.
Filed: test record per lineStandards behind the test list
The systems certificates cover the site; the product certificates cover the units. The UL evidence is a component certificate for audio, video and information technology equipment, certified to UL 62368-1.












Ask for the test record with the quotation
A configured quotation can name the checks that apply to your build, and the test record travels with the unit at dispatch.
Reply within 12 hours on working days · records written per line